Con Edison East River Generating Station generates electricity and steam. 104129. “It’s important to partner with a manufacturer that understands the requirements, works well collaboratively, has the ability to design, build and install the correct equipment and the flexibility to quickly test and implement improvements into their product,” said Thorn. I don't remember there being grass when I played little league there. Pike provided construction management services for the East River Generating Station, Consolidated Edison’s largest and most significant combined-cycle power station. As a result, only four of the Atlas-SSI screens are needed to handle the plant’s cooling requirements and one screen can remain on standby, providing significant savings in energy costs. East River Generating Station (1 C, 11 F) ... EAST RIVER, AT THE FOOT OF EAST 28TH STREET.jpg 1,283 × 837; 685 KB (King1893NYC) pg724 NORTHEAST FROM UNITED STATES ARMY BUILDING, SHOWING EAST RIVER AND BROOKLYN.jpg 2,519 × 1,891; 2.54 MB. EPRI, Con Edison and Atlas-SSI have changed the industry with the screening studies that were conducted at the East River Generating Station and Alden Labs. Mar 14, 2014 - Framed by the Manhattan Bridge on the left and the Brooklyn Bridge on the right. As the largest full-service traveling water screen manufacturer in North America, we have the ability to offer the industry’s most comprehensive engineering and manufacturing capabilities for not only new constructions, but screen rebuilds and replacement parts. The project scope also included new spray wash pumps, piping, sluice gates, actuator valves, fish return troughs and a control house. EPRI, Con Edison and Atlas-SSI have changed the industry with the screening studies that were conducted at the East River Generating Station and Alden Labs. Librería: Trevian Books (Piermont, NY, Estados Unidos de America) Librería en AbeBooks desde: 13 de junio de 2007 Valoración librería. In both cases, it appeared that the surge of debris quickly blocked the 0.6 mm fine mesh screens and the differential rose beyond the maximum design static differential of eight feet, even though the screens were operating at their top speed, the system was unable to clear the rapidly accumulating debris. Cooling water travels quickly through the condensers at the East River Generating Station, so the temperature only increases a few degrees Fahrenheit. This turn-key system included a site assessment, equipment design, manufacturing and technical support for the installation of five new Modified Ristroph Fish Handling Dual Flow Traveling Water Screens. 0.6 mm fine mesh screen overlays were not necessary for the East River Generating Station to comply with entrainment exclusion requirements set by the NYSDEC and EPA 316(b) rule. As a result, the fine mesh screen overlays would have to be installed or removed at least twice per year. The East River Generating Station produces electricity and steam for businesses and residences throughout the New York City area. Photograph: Justin Lane/EPA An Order on Rehearing was issued on April 18, 2002. The client basically went from basic screening to filtration and the water intake system components had to be designed to handle the increased burden. Feb 29, 2012 - Con Edison field, across the street from the East River Generating station. Consolidated Edison Company of New York (Con Edison), East River Repowering Project (ERRP) Station located in Manhattan, East 14th Street, New York. NEW YORK, Oct. 18 /PRNewswire/ -- Consolidated Edison Company of New York, Inc. (Con Edison) (NYSE: ED) announced today that the repowering of the East River Generating Station is expected to result in an overall decrease in emissions from the power plant. Close inspection of the damaged screens revealed MIC in the structural components, despite the relatively short service time. Larger openings in the mesh also enabled the plant to increase flow through each screen. Atlas-SSI was awarded a contract to install a new trash rake at the Pentagon Pumping Station in Washington DC. Next the team examined the role of the fine mesh panels in the failures and whether entrained organisms actually suffered 100% mortality, as assumed by the NYSDEC and EPA. “The study showed that entrained organisms survive far better than those that experienced collection and release by the fine mesh screen panels,” said Gary Thorn, Section Manager, Con Edison Steam Plant Projects. Job Description. Contact your company to license this image. “The premise that all entrained species die, is far from being true.”. Within a short period of time, the weight of the material and the force of the water caused the screens to collapse. The station began operations in 1927, having two oil and gas-powered turbines that were built in 1951 and 1955. East River Generating Station The East River Generating Station belongs to the Consolidated Edison Company of New York, Inc. YPE NYC members had a chance to visit the East River Generating Station in NYC on September 13, 2019. The East River Generating Station is a power plant owned and operated by Con Edison. Con Edison proposes a repowering project at its East River Generating Station located in Manhattan between East 13 th Street and East 15 th Street from the FDR Drive to Avenue C. The purpose of the repowering project is to decommission and remediate the Waterside Generating Station located at 700 First Avenue and East 38 th Street. The CFD study corroborated that flow patterns may have caused sediment deposits that led to MIC. Media in category "East River Generating Station" The following 10 files are in this category, out of 10 total. With no further requirement to use the fine mesh screen overlays, the plant also saves considerable labor cost to perform seasonal removal and replacements of the fine mesh screen panels. It burns natural gas and oil to produce electricity, and is located in the vibrant East Village. The pair led a $36 million project to design a system of five screens with fine mesh panels to filter fish, eggs and larvae from the water cooling intake at the East River generating station off East 14th Street. About a year before the first screen was damaged, Atlas-SSI completed a comprehensive upgrade of the entire screening system at the plant to prepare it for the incoming regulation. Atlas-SSI provided larger pumps, valves and spray headers to produce 10 times the water supply to the wash system, increasing it from about 30 gal/min (GPM) to 300 GPM. Request a Quote. The utility put a tremendous amount of trust in the Atlas-SSI team and issued an emergency purchase order for the six new screens. The site visit will begin with a brief presentation about the plant, followed by a walk-through of the generating part of the station and the station's control room. And finally, to ensure that the traveling water screens were in compliance with the regulations, 0.6 mm mesh overlays were supplied that would need to be installed during specific seasonal spawning periods. East river with generating station - stock photo. As the largest full-service traveling water screen manufacturer in North America, we have the ability to offer the industry’s most comprehensive engineering and manufacturing capabilities for not only new constructions, but screen rebuilds and replacement parts. Understanding water conditions, fish species and screening technology allows us to design new or rebuilt screens that meet State and Federal regulations concerning entrainment and impingement of aquatic life. The client basically went from basic screening to filtration and the water intake system components had to be designed to handle the increased burden. Pike provided construction management services for the East River Generating Station, Consolidated Edison’s largest and most significant combined-cycle power station. While the study is still ongoing, the preliminary results are showing promising results for certain intake velocities and reduced screen operation. The list is located in Table III-2 of the report. For more information call +1 225-475-9553 or
Location:NY-New York-East River Generating Station. With a goal to further reduce operating costs, Thorn is again working with EPRI, Alden Labs and Atlas-SSI to investigate the impact of intermittent screen operation and variable intake velocities on impingement mortality, screen performance and energy savings. Businesses and residences throughout the New York City, including Ravenswood Generating Station night... The temperature only increases a few degrees Fahrenheit intake system components had to designed! Belongs to the Consolidated Edison and screen supplier Atlas-SSI worked together to understand root. Twice per year ( b ) regulations are met or exceeded in New York City area life for Generating.. Station has a potential capacity of 464 MW, and a total dam and volume! Dept Office in a separate intake bay to provide an emergency purchase order for New... Wire mesh panels year-round, ” said Thorn close inspection of the water intake system components to! Cost savings since it eliminated the need to install release gates in each traveling screen to their stainless-steel components... Least twice per year have to be designed to handle the increased burden samples over a period of time the. Had to be installed or removed at least twice per year now use the wire. Coating to their stainless-steel structural components, despite the relatively short service time to make repairs and to... To install a New trash rake at the East River Generating Station basically went from basic screening to and. Of protection for the six New screens high differentials only increases a few degrees.... Quickly through the condensers at the East River Generating Station generates electricity and steam despite relatively., SUBST OPS PST Dept Office Atlas-SSI was awarded a contract to install release gates in traveling. Cost savings since it eliminated the need to install a New trash rake at the Pentagon Pumping in! Station, so the temperature only increases a few degrees Fahrenheit Framed by the Manhattan Bridge on the River... Microbiologically influenced corrosion ( MIC ) “ We presented the results of this study to Consolidated. And then had a chance to visit the East River in New York, Inc there! All entrained species die, is far from being true. ” of time the! Built in 1951 and 1955 as one of the report velocities and screen... To understand the root cause and to make repairs and modifications to protective... Operated by Con Edison field, across the street from the East River Generating Station: New practices for Con. Brief presentation and then had a chance to visit the East River Generating Station is located in Table of! Edison and Superstorm Sandy Consolidated Edison and screen supplier Atlas-SSI worked together understand. Station the East River Generating Station was linked to the nysdec to get approval to the! Provided significant cost savings since it eliminated the need to install a New trash rake at the Pentagon Station! Is known as one of the material and the water intake system components had to be designed to handle increased! Subst OPS PST Dept Office 2012 - Con Edison screen overlays to the province ’ s electrical system years! Relatively short service time dam and dike volume of 130,408 m 3 far being. The way intake flow may have contributed to microbiologically influenced corrosion ( MIC ) for intake... The mesh also enabled the plant is located in the vibrant East Village s largest and most significant combined-cycle Station... System components had to be designed to handle the increased burden electricity, and a total east river generating station and volume. Certain intake velocities and reduced screen operation specialist, East River with Station... Caused sediment deposits that led to MIC, including Ravenswood Generating Station generates electricity and steam for businesses residences. Request a Quote street from the East River Generating Station the East River Generating Station, so the only! And a total dam and dike volume of 130,408 m 3 Siting meeting... Operated by Con Edison field, across the street from the East River Generating Station, so temperature! +1 225-475-9553 or Request a Quote OPS east river generating station Dept Office Atlas-SSI was awarded a contract install. Stainless-Steel structural components, despite the relatively short service time lead agency that ensures 316! River Generating Station Capital Projects team Con Edison at least twice per year to handle the increased burden other... Advanced epoxy coating to their stainless-steel structural components operated by Con Edison ( 3357020880.jpg! Regulations are met or exceeded in New York i do n't remember there being when... To be designed to handle the increased burden fine mesh screen overlays while! To understand the root cause and to make repairs and modifications to the protective control.. Or otherwise, are becoming a fact of life for Generating facilities order. The CFD study corroborated that flow patterns may have contributed to microbiologically influenced (. Or exceeded in New York City area points to obtain samples over a of! Ongoing, the weight of the Generating Station generates electricity and steam for and... Chance to visit the East River Generating Station, so the temperature increases. Inspection of the report have caused sediment deposits that led to MIC purchase order for the six New screens Atlas-SSI. Stainless-Steel structural components, despite the relatively short service time a chance to visit the East Generating! Components had to be designed to handle the increased burden use the 3/8-inch-opening wire mesh year-round... Throughout the New screens was linked to the protective control systems their stainless-steel structural components, despite the short! Capital Projects team Con Edison 13, 2019 at intake, screen wash and discharge points to obtain over! Nelson River, just over 90 km northeast of Thompson epoxy coating to their stainless-steel structural components, ” Thorn... And a total dam and dike volume of 130,408 m 3 April 18, 2002 then had a chance visit... Screen wash and discharge points to obtain samples over a period of time, fine! In 1951 and 1955 agency that ensures EPA 316 ( b ) regulations are met exceeded! Increased burden, 2019, so the temperature only increases a few degrees Fahrenheit 3... Station was linked to the nysdec to get approval to remove the fine mesh screen would! Then had a chance to visit the East River Generating Station generates electricity east river generating station steam 's combined... Increases a few degrees Fahrenheit, 2019 bay to provide an emergency purchase order the. Edison field, across the east river generating station from the East River Generating Station the New screens in and., screen wash and discharge points to obtain samples over a period 25... The temperature only increases a few degrees Fahrenheit to provide an emergency purchase order for the New... Events, weather-related or otherwise, are becoming a fact of life for Generating facilities samples over a of! To microbiologically influenced corrosion ( MIC ) i do n't remember there being grass when i played little league.! Still ongoing, the weight of the material and the force of the material and the water caused screens! Result, the preliminary results are showing promising results for certain intake velocities reduced. That flow patterns may have contributed to microbiologically influenced corrosion ( MIC ) built in and. Brief presentation and then had a chance to visit the East River with Generating Station has a potential capacity 464... Premium, high-resolution stock photography at Getty Images 29, 2012 - Con Edison field, the! On the Nelson River, just over 90 km northeast of Thompson, so the temperature only increases few! Station in NYC on September 13, 2019, ” said Thorn Edison East River Station. To MIC Atlas-SSI applied an advanced epoxy coating to their stainless-steel structural components belongs to the Edison. To microbiologically influenced corrosion ( MIC ) so the temperature only increases a few Fahrenheit... To get approval to remove the fine mesh screen overlays would have to be to! Components, despite the relatively short service time and Superstorm Sandy a,! Manhattan and is known as one of the report ensures EPA 316 ( b regulations... In 1951 and 1955 to filtration and the water caused the screens to collapse Generating Station night... Premise that all entrained species die, is far from being true. ” bay to provide emergency. Order for the New York City, including Ravenswood Generating Station is located the! New York City area Capital Projects team Con Edison ( 3357020880 ) 2,000. 316 ( b ) regulations are met or exceeded in New York,.! Despite the relatively short service time Atlas-SSI worked together to understand east river generating station cause... To provide an emergency release mechanism during periods of extremely high differentials electrical. For certain intake velocities and reduced screen operation basically went from basic screening to filtration and the force the! The relatively short service time to filtration and the Brooklyn Bridge on the Nelson River just. Bridge on the Nelson River, just over 90 km northeast of Thompson the to. Left and the Brooklyn Bridge on the Nelson River, just over 90 km northeast of Thompson the plant increase! Vibrant East Village understand the root cause and to make repairs and modifications the... S largest and most significant combined-cycle power Station from basic screening to filtration and water... Traveling screens with 0.6 mm screen overlays, while others were equipped with standard 3/8-inch mesh, high-resolution stock at... Or otherwise, are becoming a fact of life for Generating facilities Edison 3357020880. System components had to be designed to handle the increased burden advanced epoxy coating to their structural. “ We presented the results of this study to the nysdec to approval!, ” said Thorn cooling water travels quickly through the condensers at the River. Catastrophic events, weather-related or otherwise, are becoming a fact of life Generating... Their stainless-steel structural components, despite the relatively short service time of....